ENEA Operator Poznań

Task: Development concept and supplies for the ENEA Data Centre


Project:

The subject was the selection and delivery of fully equipped 4DC server racks (26 pcs.) with the development and integration with CyberRow targeted cooling air-conditioning units from STULZ. The racks were equipped with IP power distribution units (52 pcs.)

 

ICT connections in the kiosk were provided as follows: optical fibre technology using OM4 optical fibre cables terminated with LC connectors in telescopic optical distribution frames.

 

Copper connections – Class EA based on BKT 695 Cat 7 cable

(Delivery of copper and optical fibre patch cables).

zamknij
Ladies and Gentlemen, in order to provide services at the highest level, as part of our service we use cookies. Using the site without changing the settings for cookies is that they will be posted in your terminal. If you do not agree, please feel free to make appropriate changes in the settings of your web browser.